Electrical Upgrades for the East Brampton Pumping Station
Recent Bennett Construction Group Project
Scope of Work
Supply and Installation of Temporary Excavation Shoring for 750mm Watermain
Removal of ±3,000cum of Topsoil and Subsoil
Hauling and Disposal of ±1,800cum of Excess Excavated Materials
Excavation, installation and backfilling of about ±60m of 100mmO Storm Drain. Installation of ±115m of 150mmO Perimeter Drain.
Supply and installation of (6) Precast Concrete Manholes at depths from 0.5m to 4m
Cast in Place concrete construction of new electrical building (approximately 370 cum)
Installation of new 44kV Ductbank.
Remove existing Substation and relocate Equipment to new Outdoor Substation.
Install 44kV Outdoor Switchgear, 4.16kV Indoor, SWGR98000, and 4160V MCC
Supply and Install (8) new Pressure Monitor Assemblies in Main Pump Room
Install structural steel HSS Columns and Steel Beams for Electrical Room Expansion. Install Steel railings along Electrical Room Roof Parapet