Electrical Upgrades for the East Brampton Pumping Station
Recent Bennett Construction Group Project
Owner: Region of Peel
Contract Value: $15,943,700.00
Scope of Work:
- Supply and Installation of Temporary Excavation Shoring for 750mm Watermain
- Removal of ±3,000cum of Topsoil and Subsoil
- Hauling and Disposal of ±1,800cum of Excess Excavated Materials
- Excavation, installation and backfilling of about ±60m of 100mmO Storm Drain. Installation of ±115m of 150mmO Perimeter Drain.
- Supply and installation of (6) Precast Concrete Manholes at depths from 0.5m to 4m
- Cast in Place concrete construction of new electrical building (approximately 370 cum)
- Installation of new 44kV Ductbank.
- Remove existing Substation and relocate Equipment to new Outdoor Substation.
- Install 44kV Outdoor Switchgear, 4.16kV Indoor, SWGR98000, and 4160V MCC
- Supply and Install (8) new Pressure Monitor Assemblies in Main Pump Room
- Install structural steel HSS Columns and Steel Beams for Electrical Room Expansion. Install Steel railings along Electrical Room Roof Parapet